pulled out a bunch of concrete
dug a 90 foot long trench from the road to the house
and installed a new sewer
installed insulated skirting between the piers
rebuilt and skirted all the piers along the front side of the house
then a coat of "quickwall"
removed the roof over the front half of the house
built the new bearing wall
installed ceiling joists
cut rafters
and we've almost got a roof...